Selecting materials by cost and availability
This is from AQA GCSE Design and Technology. Pick the material that meets the need at a sensible cost and that you can actually get in time. Cost is the price per unit times the amount you need. Add extra for waste and for fixings, or the total will be too low.
A school makes a batch of 40 stool seats. Each seat needs 0.12 m² of board. MDF costs £8 per m² and needs 25% extra for waste. Recycled plastic board costs £11 per m² and needs no extra for waste. Calculate how much cheaper the MDF is for the batch.
The MDF is £4.80 cheaper for the batch (£48.00 compared with £52.80), even though it needs 25% extra for waste.
Cost
- Price per unit
- Amount needed
- Waste allowance
- Fixings and finishes
- Total for the batch
Availability
- Is it in stock?
- Delivery time
- Right size or thickness
- Enough for the whole batch
- Can it be reordered?
Try one question
(a) Calculate the cost of the pine board for one shelf. [1 mark] (b) Calculate the cost of the oak board for one shelf. [1 mark] (c) Calculate the material cost of the whole batch if pine is used, including fixings. [1 mark] (d) Choose pine or oak for the batch. Justify your choice using cost and availability. [1 mark]
The rest of this topic is in the app, marked point by point.
Start free